Tuesday, June 30, 2015

Wifi antenna replacement

Stephane welding a plug for a new antenna
in 77-009 TUGELA mast

Monday, June 29, 2015

Removing genset out of BERENICE E.R.

Moving the boat with the help of the Villefranche sur Mer harbour
people (main engine disconnected)
Main engine on the stone pier
Genset (450kg) at the very far end of the engine room was first lifted and slides
 made of wood and greased steel plates were slipped underneath
Coming out of engine room through companionway hatch
actually quite wide on Swan 80's
BSM mechanics team posing in front of their trophies

Tuesday, June 23, 2015

Swan 80 BERENICE coming into Villefranche harbour

Windscreen glass installation on SILANDRA V

Laurent replacing a windscreen glass on
76 custom SILANDRA V 

B&G Zeus² 12"

B&G Zeus² installed at helm of
Swan 77-007 BANDOLERO
Stephane and Denis trying to find their way
through some untidy wiring
Seaview SPS4 pod monted on existing
helm pedestal console

Tuesday, June 16, 2015

Tuesday, June 9, 2015

STORM leaving Villefranche

Swan 461 STORM leaving Villefranche dock this morning.
Have a nice sailing !

Spraying Gelcoat

Mr. J.P. spraying gelcoat on Swan 53 BALLYTRIM bow